Cameron, I and Hare, B (2008) Planning tools for integrating health and safety in construction. Construction Management and Economics, 26(09), 909.

  • Type: Journal Article
  • Keywords: health; management; qualitative; planning; safety
  • ISBN/ISSN: 0144-6193
  • URL: https://doi.org/10.1080/01446190802175660
  • Abstract:
    Approaches to planning for health and safety in the UK construction industry have been criticised for being bureaucratic and irrelevant, especially if done by individuals in isolation. This paper reports on the findings of a research project, commissioned by the UK Health and Safety Executive, which investigated the integration of health and safety with construction project planning. A combination of group and individual interviews were undertaken, with qualitative methods of analysis, to develop integrated management tools for all members of the project team. Eight integrated tools were developed: a responsibility chart; an option evaluation chart; health and safety hazard workshops; safety information on drawings; red-amber-green lists; health and safety milestones on programmes; and a design change control process. These were found to aid project planning while simultaneously integrating health and safety issues. However, recommendations are given on how their application can be improved.

Chiara, N and Garvin, M J (2008) Variance models for project financial risk analysis with applications to greenfield BOT highway projects. Construction Management and Economics, 26(09), 39.

Damnjanovic, I, Duthie, J and Waller, S T (2008) Valuation of strategic network flexibility in development of toll road projects. Construction Management and Economics, 26(09), 90.

Huang, Y-L (2008) The pricing of conditional performance guarantees with risky collateral. Construction Management and Economics, 26(09), 78.

Jaillon, L and Poon, C S (2008) Sustainable construction aspects of using prefabrication in dense urban environment: a Hong Kong case study. Construction Management and Economics, 26(09), 66.

Laryea, S and Hughes, W (2008) How contractors price risk in bids: theory and practice. Construction Management and Economics, 26(09), 24.

Li, H, Guo, H, Skibniewski, M J and Skitmore, M (2008) Using the IKEA model and virtual prototyping technology to improve construction process management. Construction Management and Economics, 26(09), 1000.

Styhre, A (2008) The role of social capital in knowledge sharing: the case of a specialist rock construction company. Construction Management and Economics, 26(09), 51.